Mounting A A C To A Cinder Block Wall

An epoxy bolt is a threaded shank that comes with a nut.
Mounting a a c to a cinder block wall. How to hang a heavy object on a cinder block wall. Pick masonry anchors that are designed to support the load of your hanging. Lower density blocks. Measure the area where you want to install the mount.
The aggregate used for high density blocks is usually sand and or fine gravel. One fastener for the job is an epoxy bolt manufactured for use in cement and with epoxy glue. How to mount into a cinderblock. I am showing a cheap trick when you don t want to spend the money on expensive dowels or specialized mounting devices.
A concrete block cement block foundation block or concrete masonry unit cmu is a large rectangular block used primarily in the construction of walls. Position the bracket so the screw holes line up the mortar joints between the blocks as close to the center of the marks as possible. Concrete blocks are made from precast concrete i e. This is how you use cinder blocks to support this thing.
Portland cement water and aggregate. Best for heavy duty load applications in concrete blocks and thin wall or solid concrete. Lay out the heavy object s anchor placement and spacing on the cinder block wall with a pencil using a tape measure and bubble level as a. Cinder block is a difficult medium to attach anything significant to.
Have expanding wings that grips interior of the wall. Don t know if this is the correct forum for this but i figured i d start here. Can be used in all types of walls but most commonly used in drywall. Ribbed anchor masonry concrete anchors.
Drill all the way through the back of the cabinet penetrating into the cinder block wall to a depth of 2 inches. Hold the mounting bracket against the wall within the borders of the marks made in step 1. Equip an electric hammer drill with the masonry drill bit included in an anchor kit. Just a drill and a piece of wood will.
Use a level to make marks that are parallel. Require a pilot hole. Mark all the screw holes that line up with the mortar joints with a pencil. Its porous baked hard surface that tends to break away when drilled.
We don t want the shop to be part of the main hvac system because of dust paint fumes solvents etc.