Nailing Pattern For Roof Felt

Roll out the felt toward the other end of the roof.
Nailing pattern for roof felt. Roof rafters to ridge valley 2 16d common end nail. Setting the roll and then nailing off. Fasten drip edge on eaves with. Space each nail apart by about 30 to 36 inches 76 to 91 cm along the side of the felt closest to the roof s peak and 12 inch 30 5 cm along the side closest to the ground.
Bsd 321 handout fastening schedule. Most of the time you ll need to contact a local building inspector directly to get a definite answer if it s not already written out for you on the blueprints or manufacturers specifications. Rafter or roof truss to top plate table and section 2308 7 5 3 10 common 316d box 410d box 43 x0 131 nails 4 3 14 gage staples 7 16 crown toenail c 7. The top edge of the felt should be nailed no less than every eight inches.
Pick up the roll with both hands. Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges. From behind the roll reach over and nail down the top of the strip with roofing nails spaced 6 to 8 inches apart. Contact roofhelp 12 24 nailing pattern for roofing felt each row of nails that are 24 on center should be approximately 12 from the outside edge of the roll.
This way i don t get chewed out by the building inspector when they show up to inspect that particular. Pay careful attention to roll the felt out smoothly avoiding wrinkles as you move across the roof. Contact roofhelp 9 18 nailing pattern for roofing felt each row of nails that are 18 on center should be approximately 12 from the outside edge of the roll. All nails and staples should be placed on the lower half of the paper.
Where a roll ends and a new one is begun the two rolls should be overlapped by four inches. Anchor the top corner of the felt after it has been properly positioned and roll the felt out across the roof. I like to give them a call about any new nailing schedules that i m uncertain about. Pull straighten and align the felt along the eaves.
This video walks through the very basic steps for installing tarpaper felt. X research source small sheds usually require about 100 to 150 clout nails. Valley ridges and hips should have a 6 inch overlap of paper. Installing roof felt is a two person job.
Starting a roof with tarpaper felt.